Аудит изысканий · замечания экспертизы

Ответы на замечания экспертизы по изысканиям

Пришли замечания к отчётам по изысканиям — разберём, подготовим ответы и правки и проверим исправленный комплект до окончания срока.

Разбираем замечания государственной или негосударственной экспертизы к результатам изысканий, готовим ответы со ссылкой на лист и исправленный комплект. Время ограничено: изменения вносят не позднее чем за 10 рабочих дней до окончания срока экспертизы (ПП РФ № 145, п. 31).

Разбор отвечает на три вопроса

  1. Что исправить, а что пояснитьпо каждому замечанию — действие, норма и ответственный
  2. Успеваем ли в сроксколько дней осталось и что будет после отрицательного заключения
  3. Нужны ли новые работыесли для ответа не хватает данных

Подбор

Где вы сейчас

Выберите ситуацию — покажем, что сделаем и сколько это стоит.

Ответы в ходе экспертизы

Ориентирот 25 000 ₽

Изменения вносят не позднее чем за 10 рабочих дней до окончания срока экспертизы (ПП РФ № 145, п. 31). Цена — за вид изысканий.

Из нашей практики

Пример: замечания Мосгосэкспертизы и наши ответы

Реальные замечания к отчёту по гидрометеорологии жилого комплекса в Москве, 2026 год (объект не называем). Ответы и исправленный комплект подготовили за 3 рабочих дня.

Нажмите на уровень, чтобы оставить только его.

Ответы на замечания к отчёту ИГМИЖилой комплекс в Москве · Мосгосэкспертиза · 2026

  1. 1
    Отчёт целиком
    Отчётная документация не подписана УКЭП ответственных исполнителей и руководителя.
    Приказ Минстроя № 783/пр, п. 7
    Отчётная документация подписана УКЭП ответственных исполнителей и руководителя организации.Где исправлено: файлы отчёта и подписи
    Критично
  2. 2
    Задание
    Неверные наименование и адрес, нет основания для работ, сведений о заказчике и границ площадки; требование о подтоплении не по виду изысканий; задание не утверждено.
    СП 47.13330.2016, п. 4.13–4.17
    Задание переоформлено по п. 4.13–4.17: адрес по ГПЗУ, основание — договор, границы — каталог координат и ситуационный план. Оценка подтопления исключена (она в составе ИГИ), предусмотрена оценка затопления. Задание утверждено заказчиком.Где исправлено: приложение А
    Критично
  3. 3
    Программа
    Программа не соответствует требованиям к содержанию и не согласована заказчиком.
    СП 47.13330.2016, п. 4.18–4.20, 7.1.20; СП 482.1325800.2020, п. 4.9, 4.10, 5.1–5.5
    Программа дополнена: климатическая справка ЦГМС, методы, сроки, объёмы работ с фотофиксацией. Программа согласована заказчиком.Где исправлено: приложение Б
    Критично
  4. 4
    Титульный лист
    Оформление титульного листа не соответствует стандарту.
    ГОСТ Р 21.301-2021, п. 5.3.1–5.3.5, 5.8, 9.1.6
    Титульный лист оформлен по ГОСТ Р 21.301-2021: СРО, заказчик, обозначение, номер тома, должности и подписи.Где исправлено: титульный лист
    Оформление
  5. 5
    Разделы отчёта
    Нет сроков работ и дат передачи, объём работ не соответствует заданию, нет исходных данных для гидрометеорологических характеристик.
    СП 47.13330.2016, п. 4.39, 7.1.8, 7.1.21; СП 482.1325800.2020, разд. 5; СП 131.13330.2025
    Состав отчёта приведён к п. 4.39 и разделу 7 СП 47, разд. 5 СП 482, климатические данные — по СП 131.13330.2025; добавлены сроки работ и исходные данные.Где исправлено: разделы 1.3, 4.3, 7, приложения Г–И
    Нужен ответ
  6. 6
    Сведения об исполнителе
    Нет выписки из реестра членов СРО, действительной на дату передачи отчёта.
    ГрК РФ, ст. 47 ч. 2, ст. 55.17
    Приложена выписка из единого реестра НОПРИЗ на дату передачи отчёта.Где исправлено: приложение В
    Нужен ответ
  • Критично — без исправления — высокий риск отрицательного заключения
  • Нужен ответ — исправить документ и ответить эксперту по существу
  • Оформление — исправляется быстро, но тоже задерживает заключение

Ответ даём по существу и со ссылкой на лист: эксперту проще снять замечание, когда видно, где именно исправлено.

Нормы

Сроки экспертизы и повторная подача

Цифры — для государственной экспертизы по ПП РФ № 145 (ред. 28.04.2026).

ЭтапСрок или правилоНорма
Проверка документов на входе3 рабочих дняПП РФ № 145, п. 21
Формат файлов нарушендокументы могут оставить без рассмотренияПП РФ № 145, п. 23
Устранение недостатков при приёмене более 20 рабочих дней, если они устранимы без возвратаПП РФ № 145, п. 25
Срок экспертизыне более 42 рабочих дней; изыскания до проекта — 30; жильё — до 20ПП РФ № 145, п. 29
Правки в ходе экспертизыне позднее чем за 10 рабочих дней до окончания срокаПП РФ № 145, п. 31
Повторная экспертизапосле устранения недостатков из отрицательного заключенияПП РФ № 145, п. 44
Что оценивают при повторнойизменённую часть и её совместимость с остальной документациейПП РФ № 145, п. 45
Плата за повторную30 % платы за первичнуюПП РФ № 145, п. 58
Повторная по жильюбесплатно при подаче в течение 10 рабочих дней после отрицательного заключенияПП РФ № 145, п. 58
Отрицательное заключениеможно оспорить в суде или подать документы повторноГрК РФ, ст. 49 ч. 10

Негосударственная экспертиза проверяет по тем же требованиям к результатам изысканий (ГрК РФ, ст. 49 ч. 5), а сроки и порядок ответов фиксирует договор.

Как отвечаем на замечания

Шкала государственной экспертизы: где окно для правок и что будет после отрицательного заключения.

  • берём полный текст замечаний и комплект, который смотрел эксперт, — не рабочую версию;
  • по каждому замечанию решаем: исправить документ, дописать обоснование или выполнить новые работы;
  • сводим всё в реестр: действие, норма, ответственный, срок — с запасом до последнего дня для правок;
  • ответ пишем по существу, со ссылкой на лист и пункт нормы; если не согласны — обосновываем нормой;
  • проверяем исправленный комплект целиком: подписи, оформление, увязку с другими отчётами.

Положительное заключение не гарантируем: решение принимает экспертиза.

Что на схеме

Схема условная. Нажмите на пункт, чтобы подсветить его на схеме.

Шкала экспертизыпример
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 ГОСЭКСПЕРТИЗА, РАБОЧИЕ ДНИ · ПП РФ № 145 ПРИЁМ ЭКСПЕРТИЗА И ПРАВКИ ПРАВКИ НЕЛЬЗЯ 0 10 20 30 42 32 ИЗЫСКАНИЯ ДО ПРОЕКТА30 · ПРАВКИ ДО 20-ГО ЖИЛЬЁ, КРОМЕ УНИКАЛЬНЫХ20 · ПРАВКИ ДО 10-ГО ПОЛОЖИТЕЛЬНОЕ → ЕГРЗ ОТРИЦАТЕЛЬНОЕ → ПОВТОРНАЯ 30 % ПЛАТЫ, ЖИЛЬЁ — БЕСПЛАТНО ПРИ ПОДАЧЕ ЗА 10 Р.Д. · П. 58 ПРАВКИ — НЕ ПОЗДНЕЕЧЕМ ЗА 10 Р.Д. ДО КОНЦАПП РФ № 145, П. 31ПРИМЕР: 6 ЗАМЕЧАНИЙ МГЭОТВЕТЫ — ЗА 3 РАБ. ДНЯ Приём документов — 3 рабочих дня (п. 21)Начало срока экспертизыОкончание срока: не более 42 рабочих дней (п. 29) Окно для ответов и правокПоследний день для правок — за 10 рабочих дней до конца (п. 31) Повторная экспертиза: 30 % платы (п. 58)Жильё: повторная бесплатно при подаче в течение 10 рабочих дней (п. 58) ГлавГеоПроектАИШкала экспертизыпример, без масштабаЛист 4

Условные обозначения

Нажмите на обозначение, чтобы выделить на схеме.

Тип замечанияКак закрываемСколько времениПример нормы
ДокументыПереоформляем задание или программу, передаём на подпись заказчику1–2 рабочих дня на нашей сторонеСП 47.13330.2016, п. 4.13–4.19
Оформление и подписиТитульный лист, УКЭП, выписка СРОобычно за деньГОСТ Р 21.301-2021
приказ Минстроя № 783/пр
Состав отчётаДописываем разделы и приложения по своду правил1–3 рабочих дняСП 47.13330.2016, п. 4.39
Расчёты и обоснованияПересчитываем, добавляем исходные данные и пояснения2–5 рабочих днейсводы правил по видам изысканий
Нужны новые данныеДоизучение: скважины, лаборатория, съёмка, запросыпо объёму работпрограмма доизучения
Спорное замечаниеОбоснованный ответ со ссылкой на норму1 рабочий деньГрК РФ, ст. 49 ч. 5

Сроки ориентировочные: точный называем после разбора замечаний.

Этапы и сроки

Обычно ответы и исправленный комплект — 3–7 рабочих дней на вид изысканий. Если нужны новые работы — дольше, срок называем сразу.

  1. Замечания

    Полный текст замечаний, комплект, который смотрел эксперт, дата окончания экспертизы.

    день 0
  2. Разбор

    Реестр: что исправить, что пояснить, что доделать; кто и к какому сроку.

    в течение рабочего дня
  3. Исправления

    Правим документы или передаём реестр исполнителю; при необходимости — доизучение.

    1–5 рабочих дней
  4. Ответы

    Ответ на каждое замечание со ссылкой на лист.

    вместе с исправлениями
  5. Проверка комплекта

    Подписи, оформление, увязка — перед загрузкой.

    1 рабочий день
  6. Сопровождение

    Если эксперт задаёт новые вопросы — отвечаем, пока замечания не снимут.

    до заключения
Если до окончания срока мало дней, сначала закрываем критичные замечания, а оформление правим параллельно.Узнать срок для вашего объекта

Что прислать для расчёта

  • Текст замечаний полностью
  • Комплект, который рассматривала экспертиза
  • Дату окончания экспертизы
  • Контакты исполнителей разделов

Пришлите замечания — в течение рабочего дня скажем, успеваем ли. Отправить замечания

Из нашей практики

Замечания, которые сняли

Второй пример — наши изыскания: экспертиза приняла их с изменениями и дополнениями, внесёнными при рассмотрении.

Москва · жилой комплекс · 2026

Ответы Мосгосэкспертизе по гидрометеорологии за 3 рабочих дня

Замечаний к ИГМИ
6
Из них к заданию и программе
2
Подготовили
ответы, задание, программу, отчёт
Срок
3 раб. дня

Задание и программа переоформлены, отчёт дополнен и подписан УКЭП, к каждому замечанию — ответ со ссылкой на лист.

Республика Саха (Якутия), Ленск

Проходной канал: геодезия и геология

Экспертиза
негосударственная
Наши отчёты
геодезия, геология
Скважин
15
Заключение
2020

Положительное заключение с учётом изменений и дополнений, внесённых при рассмотрении

Цены

Стоимость ответов на замечания

Цена — за вид изысканий: разбор, ответы, исправления и проверка комплекта.

Ответы и правки

Разбор, ответы и исправленный комплект — в одной цене

Новые полевые и лабораторные работы, если без них замечание не снять, считаем отдельно и заранее.

Рассчитать стоимость

Замечания экспертизы

Ответы на замечания экспертизыза вид изысканийот 25 000 ₽
Аудит комплекта перед повторной подачейвсе виды изысканийот 80 000 ₽

Ориентировочные цены не являются публичной офертой. Точную стоимость фиксируем в договоре.

Отдельно

Проверка технического отчётаза вид изысканийот 35 000 ₽
Задание в XMLпо схеме Минстрояот 10 000 ₽

От чего зависит цена

  • Число и сложность замечаний
  • Число видов изысканий
  • Нужны ли новые работы
  • Сколько дней до окончания экспертизы
Сами выполняем все виды изысканийКаждое замечание — с пунктом нормыЧлен СРО в области инженерных изысканийПисьма заказчиков

Подробнее

Замечания экспертизы: что важно знать

Подготовил отдел изысканий ГлавГеоПроекта · обновлено в октябре 2026 года

Замечания экспертизы — обычная часть работы: редкий комплект проходит без них. Важно ответить быстро и по существу, потому что срок экспертизы ограничен, а правки нужно внести заранее.

Сколько есть времени

Срок государственной экспертизы — не более 42 рабочих дней; для результатов изысканий, поданных до проекта, — 30, для жилья — не более 20 (ПП РФ № 145, п. 29). Изменения в документацию вносят не позднее чем за 10 рабочих дней до окончания срока (п. 31). Значит, при 42-дневной экспертизе последний день для правок — 32-й рабочий день. В негосударственной экспертизе сроки и порядок ответов фиксирует договор.

Как разбираем замечания

Берём полный текст замечаний и тот комплект, который смотрел эксперт. По каждому замечанию решаем, что нужно: исправить документ, дописать обоснование или выполнить новые работы. Всё сводим в реестр с ответственным и сроком. Если отчётов несколько, следим, чтобы правка в одном не разошлась с другим: изменённые отметки в геологии должны совпасть с топопланом.

Каким должен быть ответ

Ответ — по существу и со ссылкой на лист исправленного документа: что сделано и где это посмотреть. Если замечание кажется необоснованным, спорить можно только нормой: предмет экспертизы — соответствие результатов изысканий техническим регламентам (ГрК РФ, ст. 49 ч. 5). Общие фразы вроде «замечание учтено» без ссылки часто приводят к повторному замечанию.

Если заключение отрицательное

Документы исправляют и подают на повторную экспертизу. В ней оценивают изменённую часть и её совместимость с остальной документацией (ПП РФ № 145, п. 45). Плата — 30 % от платы за первичную; для жилья повторная бесплатна, если документы поданы в течение 10 рабочих дней после отрицательного заключения (п. 58). Отрицательное заключение можно также оспорить в суде (ГрК РФ, ст. 49 ч. 10).

Сколько стоит

Ответы на замечания — от 25 000 ₽ за вид изысканий: разбор, ответы, исправления и проверка комплекта. Если без новых полевых или лабораторных работ замечание не снять, считаем их отдельно и называем срок до начала.

Термины

Сводные замечания
Документ экспертизы со всеми замечаниями по разделам проекта и изысканий.
Оперативное внесение изменений
Исправления в ходе экспертизы — не позднее чем за 10 рабочих дней до окончания её срока (ПП РФ № 145, п. 31).
Отрицательное заключение
Вывод о несоответствии результатов изысканий требованиям.
Повторная экспертиза
Рассмотрение исправленной документации; оценивают изменённую часть.
УКЭП
Усиленная квалифицированная электронная подпись.

Остались вопросы по вашему объекту?

Подскажем состав работ и цену — по телефону или в Telegram.

Валерия Соколовакоммерческий директор
+7 (916) 352-12-72Написать в Telegram

Нормативная база

  • ПП РФ № 145порядок государственной экспертизы (ред. 28.04.2026)
  • ГрК РФ, ст. 49экспертиза проектной документации и результатов изысканий
  • СП 47.13330.2016инженерные изыскания: основные положения
  • ГОСТ Р 21.301-2021оформление отчётов по изысканиям

Частые вопросы о замечаниях экспертизы

Сколько времени на ответ по замечаниям?

Изменения вносят не позднее чем за 10 рабочих дней до окончания срока государственной экспертизы (ПП РФ № 145, п. 31). В негосударственной — по договору.

Сколько стоят ответы на замечания?

От 25 000 ₽ за вид изысканий: разбор, ответы, исправления и проверка комплекта.

Стоимость

Вы отвечаете на замечания к чужим отчётам?

Да. Отчёт подписывает его исполнитель, поэтому исправления обычно вносит он, а мы готовим реестр, тексты исправлений и ответы. Можем и исправить сами, если исполнитель передаст файлы.

Что если замечание необоснованно?

Отвечаем со ссылкой на норму: предмет экспертизы — соответствие результатов изысканий техническим регламентам (ГрК РФ, ст. 49 ч. 5).

Сколько стоит повторная экспертиза?

30 % платы за первичную (ПП РФ № 145, п. 58). Для жилья — бесплатно, если подать документы в течение 10 рабочих дней после отрицательного заключения.

Что оценивают при повторной экспертизе?

Изменённую часть документации и её совместимость с остальной (ПП РФ № 145, п. 45).

Можно ли не успеть с правками?

Можно, если замечание требует новых работ. Поэтому срок называем в день разбора и начинаем с критичных замечаний.

Гарантируете снятие замечаний?

Нет — решение принимает экспертиза. Мы отвечаем по существу и со ссылками, чтобы эксперту было проще замечание снять.

Какие замечания бывают чаще всего?

К заданию и программе, подписям, титульному листу и выписке СРО — в нашем примере это пять замечаний из шести. Реже — к содержанию разделов и расчётам.

Пример реестра

Как избежать замечаний в следующий раз?

Проверить комплект до подачи.

Аудит изысканий

Пришлите замечания — скажем, успеем ли

Разберём в течение рабочего дня и назовём цену и срок.

Достаточно телефона — перезвоним и всё уточним. Остальное — по желанию.

+ Добавить адрес, описание или файл — по желанию

Необязательно. Заполните, что знаете, — так посчитаем быстрее.

Один файл до 10 МБ: PDF, Word, Excel, JPG или PNG. DWG и архивы пришлите на info@glavgp.ru

Как мы обрабатываем данные — обработка данных на сайте

Удобнее написать? Telegram · MAX · info@glavgp.ru